panel
basket 0
close
close
Your cart
Free delivery
Free shipping (InPost Parcel Locker - InPostPay) on orders of €59.64 and more.
total: €0.00
Language versions
Currencies
GGoogle
Overall4.0
LAST 30D2.8
12M4.4
Latest reviews
★★★★★
“Jestem pod ogromnym wrażeniem jakości i estetyki. Widać, że to nie jest przypadkowy asortyment, tylko dobrze przemyślana oferta.”
E • Google • 2026-03-27
See all reviews on Google
Change background
Add to favorites

Shower faucet EVM168-150 Brass Brown

€484.07 484.07
incl. 23% TAX, excl. shipping costs
quantity
_
+
pcs.

product unavailable

Availability: 0
Dispatched within: No products in stock. Order processing time: 7-21 business days
Product code: 9426155

Description

PRODUCT DESCRIPTION : Taking a shower can go beyond a purely hygienic function, becoming an experience that promotes internal balance and external satisfaction. Shower columns and shower sets from Tapwell were created to improve the quality of this experience. Our shower faucets are equipped with pressure-balanced thermostats, eliminating sudden changes in water temperature. When choosing a design, follow your own taste, because regardless of the properties and materials of the surface, we offer uniform, highest quality.

SERIES : EVM168- 150

SET CONTAINS : 

- Shower tap

CLEANING METHOD: Do not use strong alcohol-based cleaners. They can damage the paintwork. We recommend cleaning with a dish cloth and a little water.

Technical data

Color versions single-color
Material Brass
Multi-material product No
Style Modern
Length 302 mm
Width 81 mm
Outlet thread size 1/2"
Inlet thread size 3/4"
Flow class S.
Type single-lever
Connection hoses - external thread Flexible hose with a nut
Height 46 mm
Galvanized Yes

Product reviews (0)

baner

Other products from the same category

CHECK IT OUT

Order processing

How do we process orders?

After placing your order, we guide you through the next stages of processing — from confirming the information to shipping and post-purchase support.

01 +

You place your order

You choose the products and complete the purchase. You receive your order confirmation by e-mail.

02 ✓

We confirm the details

We provide the key information about processing and the availability of the selected products.

03 ◇

We complete your order

We prepare the products for processing. If we need additional information, we contact you.

04 →

We ship the parcel

Once your order is ready, we hand it over for shipping and send you delivery information.

05 ?

We support you after purchase

If you have questions about the product, installation or your order, we remain at your disposal.

Processing time may depend on product availability, brand, collection and the selected delivery method. Detailed information can be found on the product page and in messages regarding your order.

Why trust us

Scale, experience and support reflected in numbers

x85,000+
completed orders
x20+
selected premium brands
x2,400+
business partners
x4.4 / 5
average rating in 2026
x150+
designers and influencers working with us
x95%
tickets handled within 2h

Where can I find more information about products?

If you have any questions or doubts about our products, we encourage you to use the Knowledge Center located on our website. This is an ideal place for people who want to deepen their knowledge about our products, how to install them and use them. In the Knowledge Center you will find a lot of valuable information that will help you better understand the specificity of our furniture handles and how to use them.

Can I return ordered products?

You may return products within 14 days from the date of delivery, provided that they are complete, in their original packaging, and show no signs of use. After this period, returns are no longer possible.

 

If a defect is discovered after opening or at a later stage, only a complaint may be submitted. If a product is damaged or defective upon delivery, the issue must be reported within 3 business days of receipt.

 

Returns and complaints should be submitted primarily via our dedicated returns and complaints system, available at: https://returns.xeper.io/login.

 

Email contact at [email protected] is intended for emergency use only, in cases such as technical issues preventing access to the system. Email requests may require a longer processing time.

 

Detailed information is available in our store regulations.

What type of payment do we prefer?

We cooperate with Visa and MasterCard, Pay Pal, Google Pay, Apple Pay, BLIK, Klarna, and we also accept payment cards or simply a regular transfer as a payment system for all our products. In the stationary showroom, you can pay by transfer, card or other online payment systems. We do not accept cash payments.

Scandinavian handles

Scandinavian Handles is the largest distributor of premium furniture handles in Poland. We present furniture accessories from esteemed foreign brands and support Polish crafts. In our offer, you will find over 7,000 unique handles such as furniture knobs, oblong handles and other handles for kitchens and furniture. In addition, several thousand products from the following categories: clothes hangers, lamps, door handles, switches and much more!




Our goals

Our goal is very simple. We want to provide you with the highest quality products selected from a wide portfolio of outstanding artists and designers. That is why we are constantly enriching our catalogs and expanding our supplier base. Amongst others, we offer kitchen furniture handles, edge handles, furniture accessories and decorations from well-known brands such as Beslag Design, BB Sweden, Furnipart, Viefe or Buster+Punch.

We follow trends

We work with design offices and small interior design studios, listening to their needs and tastes. Our team is constantly looking for new, niche producers. We want to become a brand that influences current trends in interior design. We believe that our handles can change any interior, providing it with a unique atmosphere. All these accessories will complement any interior.

When quality counts

Our products are characterised by the highest quality and carefully selected materials from proven sources. Protecting the environment is very important to us, which is why leathers, paints and varnishes are selected according to the latest quality standards with the care that the brands we work with also care about the ecological production process.

The leather used in our products, such as Loop and Royal Delux, comes from Sweden, from the Tärnsjö Garveri tannery. The official founding date is 1873, although the family tradition started even earlier.

Polish crafts

The products we present are not only beautiful, but also practical, durable and solid. Interior accessories and decorations should be consistent to create a sense of harmony and order. That's why we decided to support local workshops that take care of the smallest detail in the production process and make each handle unique. Our offer includes products from brands such as: Open&Hide, Plankton, DOT and Marbelo.

Handle care

The products we sell are made of natural materials, various metals or tanned leather. Proper care, maintenance and cleaning are the basis for the longevity of such accessories. Get to know our methods and tips on how to deal with such items.




Furniture handles in our offer

The selection of Scandinavian furniture handles includes, among others, oblong, edge, recessed or shell types. In addition, there is also a wide range of knobs. In terms of materials, furniture handles are made of wood, ceramic, cast iron, chrome, metal or copper. Perfect furniture handles also come in a wide range of colours. Here you can also give yourself a touch of real luxury in the form of gold and silver knobs. People who value modern solutions can choose minimalist black handles. It is also worth matching furniture handles with other details, such as hangers.

Choose something for yourself

Enrich your interior with selected, highest quality interior and furniture details. Straight from the European designers, their studios, from the hands of professional craftsmen to your door. We are constantly enriching our catalogues and expanding our supplier base. We offer, among other things, handles for kitchen furniture, furniture accessories.

Who will we cooperate with?

We invite showrooms, furniture manufacturers, architects and designers looking for original and designer accessories for private and public spaces to cooperate with us. Contact us for information on possible cooperation: [email protected]. For architects, shops and business partners: [email protected]

SHOW
Shop is in view mode
View full version of the site
Sklep internetowy Shoper Premium